Trench Digging

Trench Digging
Digging trenches is one of the oldest types of work with both construction and excavating. Prior to World War 2, trenches were dug by hand. As workers dug the trenches deeper, the sides needed to be shored or supported, to keep the walls of the trench from caving in.

Following the World War, several innovations were made in backhoes, and trench digging seemed to fade away as a profession. By 1950, hydraulically actuated backhoes were developed, which make it possible to rapidly dig very deep trenches. Resulting from the innovations with backhoes, and because there were no workers inside digging the trenches, the walls no longer needed to be shored.

All types of trenches have what's known as a stand up time. This time is the amount of time that elapses
from the time the ditch is dug until the time the trench walls start to collapse. The stand up time is dependent on many factors, which include the type of soil, water content, trench depth, weather conditions, and whether or not the soil has been disturbed.

The stand up time can be as short as zero seconds or as long as several months, as they are very difficult to predict. Before the trench can be dug, someone must take soil samples as way of estimating the stand up time. Keep in mind that the soil conditions can be dramatically different only a few feet from where the sample of the soil was taken.

After the trench has been dug, workers will go down into the trench, and perform whatever work is needed, such as laying pipe or installing telephone lines, welding pipe, or installing valves. If the trench walls aren't supported, there is the possibility of the walls collapsing and trapping the workers in the trench. Throughout history, there have been 100 - 300 people killed in the U.S. each year due to trenches collapsing.

The public has become very aware that industrial progress will often have negative side effects as well. The place of engineers protecting the public from these types of side effects is a very controversial issue. The use of trench boxes on the site, will help to ease this debate.

The trench box, also called a trench shield, may be placed in the trench to prevent failures from injuring workers. The trench box consists of two large plates, normally made from steel, which are parallel to the walls of the trench, and horizontal cross members which will hold the two plates apart.

The lower edge of the trench box rests at the bottom of the trench, with the top edge of the box extending above the top of the trench. The workers will stay between the plates of the trench box, so that if the trench does collapse, the dirt will be stopped by the outside of the trench box. As the work progresses, the trench box is pulled along in the trench with a backhoe or other machine.

When a project calls for a large excavation such as digging the foundation for a tall building, the supporting structure for the excavated walls will be specified in the plans. The big problem with not using trench boxes occurs in cities, when water or sewer lines are being installed or repaired. The engineer doesn't specify for the
trench box in the plans, but instead leaves it up to the contractor.

Anytime you are going to be digging trenches or working in them, you should always use common sense
and take your time. Trenches can be very deadly, especially if trench boxes aren't used. To be on the safe side, you should always use a trench box if you need to be in the trench. If you don't need to be in the trench - do the smart thing and let the machines do all of the work.

To receive updates right into your inbox, please don't forget to subscribe:
Enter your email address:


Delivered by FeedBurner

Related Posts:
Trench Digging
Excavation
Trenching and Plowing Equipment
How the Earth-Moving Equipment Has Changed

Comments

Popular posts from this blog

DepEd Computerization Program (DCP) for Elementary Schools

Aside from giving computers to all secondary schools, the DepEd Computerization Program is now expanding its scope which includes elementary schools which passed the minimum requirement set  by the department. The Batch 6 of the DepEd Computerization Program (DCP) will give Multi-media Equipment for Public Elementary Schools Nationwide with the budget derived from the savings of 2003-2004 DCP Budget. The target recipients will be 93 elementary schools, which will serve as pilot schools for the DCP for Elementary Schools. On Batch 7 of the DCP, its target is to give 2,434 elementary schools with multimedia equipment. These schools should have population greater than 900 pupils. The Multimedia Classroom Package for Elementary: 1 host PC 6  17"  LCD Monitor 6 keyboard and mouse 2 kits - Desktop Virtualization Kit using shared computing technology 1 UPS 1 Interactive Whiteboard 1 3-in-1 Inkjet Printer 1 LCD Projector Face to Face lecture and hands-on training for Des

Blog Rolling, My Top 100

Scolex Portal is now expanding its horizon from a blog that has never been known to at least a blog that can be searched through Google, Yahoo, MSN, and Bing. If you want to be be part of my blog roll, leave your blog URL and be part of Scolex Portal's Top 100 Blog Roll. Please do add me in your blog roll with Free Article Directory   as anchor text. By the way you can also use any of the following as anchor text: Scolex Portal scolexportal.com www.scolexportal.com http://www.scolexportal.com Scolex blog Let's continue rolling with link exchange! Contact me! Happy blogging! MY BLOG ROLL: About Chandigarh : Chandigarh, the dream city of India's first Prime Minister JwaharLal Nehru is the best example of planned architecture and urbanization. Tricity Chandigarh is, indeed, a best residential place in North India. Abstract art A blog about different abstract arts that are worth keeping. Accessibility reviews Spotless Interactive are experts in